U.S. Army Updates Requirements For Armor-Piercing Missile

Joint Light Tactical Vehicle
Credit: B Christopher / Alamy Stock Photo
The U.S. Army reduced a loadout requirement and detailed other requirements for a future armor-piercing, ground-launched missile on Nov. 7. A market survey released a year ago for the Mobile-Long Range Precision Strike Missile (M-LRPSM) called for concepts that could fire missiles simultaneously...
Steve Trimble

Steve covers military aviation, missiles and space for the Aviation Week Network, based in Washington DC.

Subscription Required

 

U.S. Army Updates Requirements For Armor-Piercing Missile is published in Aerospace Daily & Defense Report, an Aviation Week Intelligence Network (AWIN) Market Briefing and is included with your AWIN membership.

Already a member of AWIN or subscribe to Aerospace Daily & Defense Report through your company? Login with your existing email and password.

Not a member?  Learn how you can access the market intelligence and data you need to stay abreast of what's happening in the aerospace and defense community.